End-to-end redevelopment of Carretería Street in Malaga’s historic centre
End-to-end redevelopment of Carretería Street in Malaga’s historic centre
Complete renovation of the urban road section in Carretería Street in the centre of Malaga.
The works include comprehensive renovation of the sewerage infrastructure and systems plus new paving.
The sewerage network is a historic container running underneath the housing units and has to be replaced by a separate network. The new system consists of a GFRP collector for sewerage between 1200 and 1600 mm in diameter and a PVC collector for stormwater, 630 mm in diameter and 1000 mm in cross section in GFRP.
Forma
Both networks converge in a connector box that joins up with the existing network downstream from where there is an open shield jacking system consisting of a reinforced concrete pipe with a diameter of 1000 mm for stormwater discharge.
The low and medium voltage and telecommunications systems and other municipal services such as lighting, traffic lights, etc. have also been renewed. The pedestrian areas are paved with prefabricated slabs featuring a honed finish and the roadway with Naturasfalt hot bituminous mix with a polished surface treatment.
Technical data
Demolition of paving: 4,527 m2
Dismantling of stone steps: 428 lm
Demolition of sewage piping: 419 lm
GFRP sewerage pipe Ø1600: 114 lm
GFRP sewerage pipe Ø1000: 120 lm
Ductile cast iron pipe Ø300: 143 lm
Amber Cream marble linear drainage channel: 445 lm
Quintana Grey granite kerb edging: 886 lm
Honed finish prefabricated concrete slab paving : 797 m2
Naturasfalt HBM paving: 73 t