Renovation and refurbishment of Calle Condesa Vega del Pozo in the district of Vicálvaro
Renovation and refurbishment of Calle Condesa Vega del Pozo in the district of Vicálvaro
The works involve the pedestrianisation of Calle Condesa Vega del Pozo, so the existing pavement will need to be fully renovated.
Client:
Madrid City Council
Location:
Madrid
Period:
2022 - 2023
Type of service:
Public roads and signage
Budget:
338.633,06 €
DETAILS
Technical data
Demolition and movement of earth
- 215 m3 demolition of concrete base
- 1,145 m2 demolition of paving
- 134 m2 demolition of asphalt paving
- 954 m2 raising of granite pavers
- 698 ml raising of curb
- 83 units dismantling of Fuencarral bollards
- 2,802 m2 refining, levelling and compacting of the surface
- 345 ml channelling for lighting network
Paving
- 443 m3 HM-15/P/40 mass concrete
- 24 ml prefabricated concrete curb (types III, IV and IX)
- 43 m2 hydraulic tile (buttons colour 40x40 and grooves colour 40x40)
- 10 m2 MBC AC22/32 and 244 m2 MBC AC16/22 paving
- 2,355 m2 pavers (concrete and granite)
- 10 m2 shot-blasted terrazzo tiles
- 76 units levelling of manholes
Urban furniture
- 18 Diana benches
- 1 Cibeles waste bin
- 13 vertical reflective signs
- 17 Villa LED streetlights
- 145 m3 of topsoil
- 2,722 units of bushes planted
- 1 automatic irrigation network with 695 ml of drip irrigation piping
- 45 ml of 315 mm PVC piping
- 1 manhole
- 1 brick soakaway
- 14 soakaway chambers.
- 11 units soakaway modification