Pavement maintenance of the east area in Barcelona


Pavement maintenance of the east area in Barcelona

Execution of works, providing the necessary means for pavement maintenance of the roads in the city of Barcelona.

Client:
Barcelona City Council
Location:
Barcelona
Period:
From March 2013 to December 2016
Type of service:
Public roads and signage
Budget:
9.335.540,12 €/año (VAT not included)

Total paved area: 5.354.358m2.

Execution of works, providing the necessary means and other essential interventions for the correct pavement maintenance of the roads in the city, formed by asphalt road surfaces or similar, concrete pavements, old cobblestone pavements, etc. and also the paving the sidewalks, formed by panot pavements, made out of prefabricated elements or natural stone.

Paving tasks done:

Scheduled tasks.
Scheduled repair interventions.  
Preventive repair work (coatings).
Reinforcing and renovation pavement works.
Follow up work

Urgent repair interventions.

 
DETAILS

Technical data

Type of work

Scheduled urgent repair works.
Preventive conservation works.
Reinforcement and renovation pavement works.
Inspections to detect pavement deterioration.

Means and equipment

22 paving teams:
Each one formed by 4 officials and 3 helpers.

2 milling teams:
Each one formed by 2 officials.

Asphalt-mixing plant:
Own asphalt-mixing plant that belongs to FIRTEC, located in Barberà del Vallès.

 

Machinery for the paving teams:

1 sweeper.
6 transportation trucks (20 Tn).
1 big paver.
1 metal compactor.
1 pneumatic roller.
1 tank trucker for irrigation.
1 truck with two axes and a dumper skip.
3 transportation trucks.