Refurbishment and conservation of public spaces in the district of Moncloa - Aravaca


Refurbishment and conservation of public spaces in the district of Moncloa - Aravaca

Refurbishment and renovation of different public spaces in the Moncloa–Aravaca district of Madrid, for greater accessibility and to improve their visual and ornamental appearance.

Client:
District of Moncloa–Aravaca, Madrid City Council
Location:
Madrid
Period:
2022
Type of service:
Public roads and signage
Budget:
€865,449
The works consist of the renovation of Parque de la Bombilla, Plaza Corona Boreal and Parque de las Siete Cabras, in the Madrid district of Moncloa–Aravaca.

The refurbishment has improved accessibility and landscaping in these urban spaces, thanks to the creation of new green areas, new areas for sitting, pedestrian routes and the renovation of the existing paving. 
 
The works carried out included:

·       Removal and demolition of the existing pavement.
·       Paving in 8 cm printed asphalt agglomerate of in red and with COMPOTOP system epoxy acrylic mortar.
·       Replacement of type IV kerbstones.
·       Paving of pavements with imitation granite concrete slabs, red hydraulic paving stones, grooved and button tiles.

·       Creation of a children’s area, an area for the elderly and a recreational area. 
·       Installation of new landscaped areas with grass lawns, shrub beds, perimeter hedges and stepped planters.
·       Installation and extension of irrigation network.
·       Replacement of street furniture.
·       Construction of new drainage network.
·       Replacement of sodium-vapour lamps with LED lamps.

This project is part of the Framework Agreement for refurbishment, repair and conservation works for all the public buildings and spaces under the authority of the Moncloa-Aravaca District (Section 4).

 
 
 
 
DETAILS

Technical data

Removal and demolition
·       1,035 m² demolition of asphalt pavement
·       643 m² demolition of pavement flooring
·       470 m³ demolition of concrete base
·       282 ml removal of kerbs
·       30,729 m²cm pavement milling

Surfacing
·       1,035 m² MBC AC 22/32 e=7 cm
·       6,156 m² MBC AC 16/22 siliceous e=6 cm with printing and acrylic coating
·       382 m² continuous epoxy resin paving (3 layers)
·       475 ml pre-cast kerbstone types IV and VI
·       269 m² imitation granite terrazzo tiles

  • Street furniture
    ·       177 units class I LED lamps, up to 55 W
    ·       14 Madrid MU-16 model benches
    ·       64 ml metal fence and 208 ml MU-5A landscape protector
    ·       1 children’s area with 3 play elements
    ·       1 area for the elderly with 6 elements
    ·       6 Fuencarral model bollards
    ·       34 ml double baluster handrail
    ·       7 units SERP Comfort model curved concrete benches 
 

Landscaping

·       1 automatic irrigation network with 3 solenoid valves and 15 drip lines
·       1 automatic irrigation network with 16 solenoid valves, 100 pop-up sprinklers and 26 drip lines
·       53 ml PVC pipe 315 mm
·       228 m³ of topsoil
·       447 m² of lawn
·       27 units Leylandii hedge
·       970 plantations of various shrub species

Downloads