Upgrade and modernisation of playgrounds in the Moncloa–Aravaca District


Upgrade and modernisation of playgrounds in the Moncloa–Aravaca District

Works to upgrade and renovate different play areas in children’s playgrounds in the Moncloa–Aravaca district of Madrid.

Client:
District of Moncloa–Aravaca, Madrid City Council
Location:
Madrid
Period:
2022-2023
Type of service:
Public roads and signage
Budget:
€618,655
Upgrade and modernisation of the Parque de la Bombilla, Plaza de la Corona Boreal, Plaza de la Iglesia de Nuestra Señora de Aravaca, Avenida Dr. Federico Rubio y Galí and Paseo Pintor Rosales, in the district of Moncloa–Aravaca.
 
The work has been completed with a combination of highly playful elements, as well as a design and construction that makes the play equipment accessible to a wide range of age groups.
 
The action is included in the Framework Agreement for refurbishment, repair and conservation works for all the public buildings and spaces in the District of Moncloa-Aravaca (Section 4).
 
Among the work carried out, the following are worth mentioning:
  • Placement of benches, fences, playground equipment and kerb.
  • Protection of the trees in the surrounding area.
  • Paving with 8 cm thick shock-absorbing rubber.
  • Paving with river sand.
  • Installation of a type VI pre-cast concrete kerb.
  • Laying of 30×2 mm Tramex mesh on the accesses defined for the children’s areas.
  • Installation of approved M-50C fencing.
  • Installation and reinstallation of new children’s furniture.
 
DETAILS

Technical data

Parque de la Bombilla 
·       100 ml removal of kerbs
·       158 ml dismantling fences
·       11 tree protections 
·       369 m² rubber paving
·       160 ml pre-cast kerbstone
·       52 m³ river sand
·       190 ml MU-50C metal fence
·       18 m² Tramex grating
·       10 benches L=2.00
·       Play equipment: Zip line, swing, individual and rotating carousel, seesaw, large slide, trampoline and pyramid.
 
Av. Dr. Federico Rubio y Galí 
·       62.50 ml fence dismantling
·       1 tree protection 
·       190 m² rubber paving
·       40 ml pre-cast kerbstone
·       62.50 ml MU-50C metal fence
·       4 m² Tramex grating 
·       Play equipment installed: Metal play structure, swing and trampoline 
 
Plaza Corona Boreal
·       13.5 ml removal of kerbs
·       58 ml fence dismantling
·       13.5 ml removal of kerbs
·       58 ml fence dismantling
·       230 m² rubber paving
·       61 ml MU-50C metal fence
·       4 m² Tramex grating
·       4 benches L=2.00 m
·       Play equipment: Playground, swing and trampoline

Paseo del Pintor Rosales–Templo Debod
·       15 tree protections
·       116 m² rubber paving
·       42 ml pre-cast kerbstone 
·       129 m³ river sand
·       13 benches L=2.00 m
·       Play equipment: Round see-saw, themed 4-seater seesaw, trampoline, carousel, slide, rocker and swinging seesaw

 
Plaza Iglesia Nuestra Señora de Aravaca 
·       81 ml removal of kerbs
·       67 ml fence dismantling
·       5 tree protections
·       280 m² rubber paving
·       67 ml pre-cast kerbstone
·       190 ml MU-50C metal fence
·       8 m² Tramex grating
·       3 benches L=2.00 m
·       Play equipment: Multifunctional playground, swing, carousel and trampoline
 
Paseo del Pintor Rosales–Cable Car
·       91 ml fence dismantling
·       18 tree protections
·       371 m² rubber paving
·       110 ml pre-cast kerbstone
·       83 m³ river sand
·       156 ml MU-50C metal fence
·       18 m² Tramex grating
·       7 benches L=2.00 m
·       Play equipment: seesaw, swing, carousel, 2 trampolines, slide, rocker with net, hexagonal net and maze
Downloads


Gallery