Redeveloping Font d’en Fargues Square in the Horta-Guinardó district in Barcelona


Redeveloping Font d’en Fargues Square in the Horta-Guinardó district in Barcelona

Refurbishment of Font d’en Fargues Square by improving the pathway joining the Horta and Guinardó districts and upgrading indoor spaces with the inclusion of new uses for local residents.

Client:
Barcelona d’Infraestructures Municipals SA (BIMSA)
Location:
Barcelona
Period:
May 2023 / February 2024
Type of service:
Environmental restoration
Font d’en Fargues Square is one of the main gateways to Guinardó Park from the Horta neighbourhood in Barcelona. Until the 1970s it was a major meeting place where people used to gather with its fountain as its distinctive feature.  However, urban development of the surrounding area meant that the water was no longer safe to drink and the site fell into disrepair. 
 
  • Against this background, the main goal was to restore dignity to the degraded environment by means of the following actions: 
  • Organising the whole area. 
  • Recovering the existing esplanades by creating areas with a range of leisure uses (picnics, recreation, sports and viewpoint). 
  • Setting up an accessible route allowing access to the central part of the square from both Mauricio Vilomara Street and La Font d’en Fargues Boulevard. 
  • Improving the space for pedestrians with a path and steps to enhance connections. 
  • Arranging the vehicle manoeuvring space to allow the school bus to turn around. 
  • Providing suitable materials for urban development as a park. 
  • Equipping the space with the lighting required and putting services currently in the overhead network underground. 
  • Adapting existing and new plants to take into account the features of the site and laying the watering network for maintaining them. 
  • Fitting accessible street furniture. 
  • Ensuring run-off water drainage. 
  • Providing drinking water, electrification and IMI cable network for the kiosk and sanitary services at the bottling plant. 

All the actions have been coordinated with the work to renovate the Font d’en Fargues fountain.

 
DETAILS

Technical data

Area of action
 
Total area: 
6,275 m2 
 
Road area:  
150 m2 
 
Pavement area:  
209 m2 
 
Park area:  
5,916 m2

Main operations

Manual clearing and levelling:  
5,297 m2  
 
Tree felling:  
48  

Digging shafts and facilities: 
1,376 m3 
 
Decomposed granite paving:  
5,062 m2

Topsoil supply and spreading:  
900 m3 
 
Shrub planting:  
7,210 
 
Tree planting:  
42 
 
Hydroseeding:  
2,415 m2 
 
Asphalt paving:  
45 t

Downloads


Gallery