Works for local improvement to the C-13 highway diversion route along the Vilanova de la Barca - Térmens section
Works for local improvement to the C-13 highway diversion route along the Vilanova de la Barca - Térmens section
The purpose of this project is to execute replantings and corrective measures for the environmental impact of the C-13 highway diversion route, from PK 13+100 to 20+000. Section: Vilanova de la Barca - Térmens.
This project includes revegetation of the sides of Highway C-13 along a 6.9 km-long section.
The works to be performed are:
- Preparation of lands.
- Planting of trees and bushes.
- Hydroseeding of slopes and flat areas.
- Installation of geotextile.
- Installation of biorolls.
- Veneering with calcareous stone under the upper passage.
- Irrigation of plants with a tanker truck.
Technical data
Hydroseeding:
164,974 m2
Planting of trees:
2,116 units
Planting of bushes:
3,279 units
Gravel:
272 m³
Veneering of vertical wall:
401 m2
Biorolls:
240 m