Maintenance and renovation of Madrid’s Basic Municipal Sports Facilities


Maintenance and renovation of Madrid’s Basic Municipal Sports Facilities

Construction of climbing wall routes in different sports facilities and public spaces in the Puente de Vallecas district of Madrid.

Client:
Puente de Vallecas District (Madrid City Council)
Location:
Madrid
Period:
2022
Type of service:
Street furniture and playgrounds
Budget:
€305,619

The project was designed as an action aimed at families and the promotion of sport for people of different ages. In addition, more complex installations are proposed to serve the whole range of users, from beginners to advanced users. The following elements are installed in each location:

· CDM Palomeras: Indoor bouldering wall inside the sports hall and 8 m high monolith outside. 
· Cerro del Tío Pío: 3 m high boulder with 4×4 m base and a shock-absorbing drop zone.
· Yesero green area: 3 m high boulder with 4×4 m base and a shock-absorbing drop zone.

· Campo de la Paloma Gardens: 3 m high boulder with 4×4 m base and a shock-absorbing drop zone.
· CDM Entrevías: Bouldering wall in one of the pavilions of the sports centre with lighting to optimise the usage time throughout the year.

This project is part of the Framework Agreement for refurbishment, repair and conservation works for all the public buildings and spaces under the authority of the Puente de Vallecas District, Section 2: Buildings for sports use.

 
DETAILS

Technical data

CDM Palomeras

Indoor bouldering wall
· 110 m2 birch wood cladding and 210 m2 matte latex paint.
· 600 polyurethane holds.
· 34 gymnastics mats.
· 4 pcs of 64 LEDs.

Outdoor monolith 
· 144 m² 2 mm fibreglass cladding and 144 m2 3 coats GreenSet resins and micrograms.
· 350 polyurethane holds.
· 63 m2 rubber paving.

IDM Yesero and Cerro del Tío Pío
The following are used for each outdoor boulder:
· 64 m² 2 mm fibreglass cladding and 64 m2 3-coats GreenSet resins and micrograms.
· 150 polyurethane holds.

Cerro del Tío Pío:
· 63 m² rubber paving.
· 30 ml of type 1 prefabricated kerbstone.

IDM Yesero:
· 99 m2 rubber paving.
· 6 ml of type 1 prefabricated kerbstone.
 

CDM Entrevías
Bouldering wall
· 95 m2 2 mm fibreglass cladding.
· 95 m2 3-coats GreenSet resins and micrograms.
· 300 polyurethane holds.
· 50 m2 continuous rubber paving.
· 20 ml of type 1 prefabricated kerbstone.
· 6 pcs of 48 LEDs.

Campo de la Paloma Gardens
Outdoor boulder
· 64 m2 2 mm fibreglass cladding.
· 64 m2 3-coats GreenSet resins and micrograms.
· 150 polyurethane holds.
· 77 m2 80 mm continuous rubber paving.
· 18 ml of type 1 prefabricated kerbstone.