Renovation of H10 Imperial Tarraco Hotel in Tarragona.
Renovation of H10 Imperial Tarraco Hotel in Tarragona.
The work entailed the comprehensive renovation of Imperial Tarraco Hotel in Tarragona. The project included the interior demolition of the hotel for structural reinforcement with a metal structure and the completion of all the interiors and installations.
Client:
Alta Diamond Projects, S.L.
Location:
Barcelona
Period:
July 2018–July 2020
Type of work:
Specific
Typology:
Hotels
Budget:
€13,980,640.25 (excluding VAT)
Construction features:
- Laminated plaster partitions.
- Laminated plaster drop ceiling.
- Stoneware flooring in the bedrooms, on the balconies and in damp areas, with faux mosaic on the balconies; carpet in the corridors; and parquet or continuous flooring in communal areas.
- Silestone cladding in the bathrooms, porcelain stoneware in the rest of the rooms; oak veneer panelling in the communal areas and Vescom vinyl walls in the corridors. Wardrobe interiors lined with paper.
- Oak veneer interior carpentry. This carpentry has also been applied to the wardrobes in the rooms.
- Façade renovated with silicate paint.
- Renovation of the rooftop, including the construction of a swimming pool.
- Replacement of all exterior carpentry.
- Installation work (electricity, gas, air conditioning, etc.) throughout the hotel.
- Demolition and construction of the parking area.
- Interior infrastructure, including renovation of an existing swimming pool.
Downloads