Residential complex in Esplugues de Llobregat
Residential complex in Esplugues de Llobregat
Construction of five multi-family buildings in the Finestrelles area of Esplugues de Llobregat with a total of 140 homes, car parks, storage rooms, a communal area with an indoor and outdoor swimming pool, a paddle tennis court and a fitness area.
Client:
Milenium Meridian S.L
Location:
Barcelona
Period:
June 2017 – October 2021 – May 2022
Type of work:
Residential
Typology:
Others
Budget:
€47,533,985
Architect:
Juan Manuel Sanahuja Escofet Lluis Rey Gómez
Total construction of 140 luxury homes and their respective car parks.
The works will take place on the plots located in the rectangle formed by the streets Avinguda Traginers, Avinguda Jacint Esteva i Fontanet and Carrer Profesor Barraquer in Esplugues de Llobregat, Barcelona.
The first phase corresponds to block B5 (already finished and in use), consisting of 27 homes, the second phase to blocks B3 and B4, consisting of 54 homes and the third phase to blocks B1 and B2, consisting of 59 homes.
The total plot covers 10,200 m², of which 2,115 m² correspond to phase one.
The total plot covers 10,200 m², of which 2,115 m² correspond to phase one.
DETAILS
Technical data
Earthworks:
Clearing of land and excavation of earth for the formation of an underground car park.
Foundation pouring:
By means of isolated footings and single and double formwork earth retaining walls.
Structure:
Horizontal structure with reinforced concrete slabs and precast concrete waffle slabs. Vertical structure with reinforced concrete pillars.
Roof:
Non-trafficable inverted building roof finished with gravel skylight, trafficable and finished with clay tiles on the outer coating, trafficable and finished with ipe wood in the attic and garden roof on the ground floor.
Facades:
Dark exposed brick facades, glass and stainless steel balustrades.
Aluminium carpentry with thermal bridge break.
Stackable and adjustable aluminium shutters. Motorised opening and closing.
Iroko slatted sliding panels on aluminium frame.
Clearing of land and excavation of earth for the formation of an underground car park.
Foundation pouring:
By means of isolated footings and single and double formwork earth retaining walls.
Structure:
Horizontal structure with reinforced concrete slabs and precast concrete waffle slabs. Vertical structure with reinforced concrete pillars.
Roof:
Non-trafficable inverted building roof finished with gravel skylight, trafficable and finished with clay tiles on the outer coating, trafficable and finished with ipe wood in the attic and garden roof on the ground floor.
Facades:
Dark exposed brick facades, glass and stainless steel balustrades.
Aluminium carpentry with thermal bridge break.
Stackable and adjustable aluminium shutters. Motorised opening and closing.
Iroko slatted sliding panels on aluminium frame.
Partitioning:
Separation of the interior distribution of the homes with laminated pladur-type plasterboard partition walls with thermal-acoustic rock wool insulation inside the structure.
Separation between homes and common areas with ceramic brick walls with pladur-type laminated plasterboard sheets on both sides of the homes.
Paving/tiling:
Clay slab pavement. Clay slab tiling.
Interior carpentry:
Armoured front doors to the houses finished in walnut on the outside.
Inside doors painted white.
Built-in wardrobes finished to match the doors. Inside lined with melamine veneer.
Electricity:
The homes are delivered with full LED lighting in the entrance hall, corridors, bathrooms, kitchen, under the upper cupboards in the kitchen depending on the type, in the dressing rooms and in front of the built-in wardrobes.
Automation system that includes in a single application:
. Shutter control
. Lighting on/off control
. Technical smoke, fire and water alarms
. Cooling
Video door station
Installation of telephone and TV/SAT sockets in bedrooms and the kitchen, and a double socket in the living room.
USB socket in the living room and bedroom suite.
Watertight socket and water connection on terraces, ground floors and attics.
Separation of the interior distribution of the homes with laminated pladur-type plasterboard partition walls with thermal-acoustic rock wool insulation inside the structure.
Separation between homes and common areas with ceramic brick walls with pladur-type laminated plasterboard sheets on both sides of the homes.
Paving/tiling:
Clay slab pavement. Clay slab tiling.
Interior carpentry:
Armoured front doors to the houses finished in walnut on the outside.
Inside doors painted white.
Built-in wardrobes finished to match the doors. Inside lined with melamine veneer.
Electricity:
The homes are delivered with full LED lighting in the entrance hall, corridors, bathrooms, kitchen, under the upper cupboards in the kitchen depending on the type, in the dressing rooms and in front of the built-in wardrobes.
Automation system that includes in a single application:
. Shutter control
. Lighting on/off control
. Technical smoke, fire and water alarms
. Cooling
Video door station
Installation of telephone and TV/SAT sockets in bedrooms and the kitchen, and a double socket in the living room.
USB socket in the living room and bedroom suite.
Watertight socket and water connection on terraces, ground floors and attics.
Cooling:
Installation of an aerothermal system that produces underfloor heating.
Installation of a ducted aerothermal heat pump throughout the building with the outdoor unit installed on the roof and the indoor unit on the drop ceilings in the bathrooms. Thermostat in each room.
Solar thermal energy:
Installation of a solar energy system that contributes to the production of domestic hot water for each home.
Installation of the community boiler and solar panels on the roof with individual metering.
Lift:
Two lifts in each block with double boarding.
Garage and storage room:
Motorised access door to the garage with remote control.
Forced ventilation, temperature detection, carbon monoxide detection, fire extinguishers and fire hoses.
Electric car charger.
Communal area:
Private outdoor area
Indoor and outdoor pool
Fitness area
Paddle tennis court
Meeting club
CCTV surveillance
Installation of an aerothermal system that produces underfloor heating.
Installation of a ducted aerothermal heat pump throughout the building with the outdoor unit installed on the roof and the indoor unit on the drop ceilings in the bathrooms. Thermostat in each room.
Solar thermal energy:
Installation of a solar energy system that contributes to the production of domestic hot water for each home.
Installation of the community boiler and solar panels on the roof with individual metering.
Lift:
Two lifts in each block with double boarding.
Garage and storage room:
Motorised access door to the garage with remote control.
Forced ventilation, temperature detection, carbon monoxide detection, fire extinguishers and fire hoses.
Electric car charger.
Communal area:
Private outdoor area
Indoor and outdoor pool
Fitness area
Paddle tennis court
Meeting club
CCTV surveillance