Building the Argos II residential complex, commercial premises and garages in east Seville


Building the Argos II residential complex, commercial premises and garages in east Seville

Building 290 homes featuring communal leisure areas, parking and commercial premises. This project is located at Avenida de Las Ciencias, 19, Seville.

Client:
Edificio Goya 63, S.L.
Location:
Seville
Period:
December 2019 – February 2022
Type of work:
Residential
Budget:
27.303.035€ (excluding VAT)
Architect:
ATRIO, Estudio de Arquitectura, S.L.P.

A 290-home housing development is being built in east Seville in a residential complex featuring swimming pools, children’s play areas, garages, and commercial and tertiary premises.  

This complex is split between a main building with 244 apartments and two facing buildings each containing 23 apartments.  

The foundation and retaining walls are made of foundation slabs and reinforced concrete walls.  

The load-bearing structure is built using reinforced concrete columns and core walls and solid reinforced concrete slabs and horizontal waffle-grid framework with sunken coffers. 

The exterior wall cladding is composed of multilayer cladding, half-wall of perforated ceramic brick to cover and self-supporting lining.  

The interior divisions are made from plasterboard sheets for separations between homes and tertiary use and communal and local zones without defined use. The steps on the interior stairs in living spaces are finished with granite; class 32 laminate surface and skirting board in homes; matt porcelain stoneware tile flooring also in homes, and continuous mass concrete and/or printed surface in zones of other use.  

Coloured rubber flooring is only for play areas, stoneware for communal areas, and artificial turf and synthetic pool decking for the communal non-living spaces.

 
DETAILS

Technical data

Concrete for foundation and structure: 20,472 m³  

Formwork: 47,846 m² 

B500S corrugated steel: 2,507.188 kg 

Plasterboard panels for partitions and ceilings: 67,331 m² 

Masonry for half-brick walls, breeze blocks and patching: 53,075 m² 

Tiling and flooring: 28,543 m² 

Laminated surface: 16,356 m²  

ETIS façade: 14,489 m² 