Rain water holding tank


Rain water holding tank

Rain water holding tank cleaning system (anti-DSU) in La Bunyola y Aviació, El Prat de Llobregat (Barcelona).

Client:
City Council of Prat de Llobregat
Location:
Barcelona
Period:
From March 2010 to August 2010
Type of service:
Projects

Coutex, Equipos y Proyectos, S.A. has performed the design, manufacture and assembly of 5 quick opening flaps (CLAPR) of 2,800 x 400 mm with oleo-hydraulic activation, in AISI 316L stainless steel, activated by 2 oleo-hydrographic cylinders. The flaps have been designed to bear the thrust of 4 mca and the sluices for 5 mca.

The opening takes place in 1 second, which causes a wave that cleans the sediment that has been generated while storing water in the tank. Water entry to the tank is performed by a wall mounted fixed wheel sluice (CMW) of 4,500 x2,200 mm and two additional wall mounted sluices (CM05) of 1,000 x 1,000 mm.

 
DETAILS

Technical data

Cleaning flaps 

5 quick opening flaps of 2,800 x 400 mm. Hydraulic action.

Entry sluice 

5 quick opening flaps of 2,800 x 400 mm. Hydraulic action.

Outlet sluice  

2 wall sluices of 1,000x 1,000 mm. Electric activation.

Material

AISI 316L stainless steel.


Gallery