El Torito Hydroelectric Power Plant, Costa Rica

Central Hidroeléctrica de El Torito, Costa Rica

El Torito Hydroelectric Power Plant, Costa Rica

Construction of the gratings of the discharge canal at the El Torito Hydroelectric Power Plant in Costa Rica. The company Gas Natural was awarded contract for construction and operation for a period of 20 years.

Client:
Gas Natural
Location:
America
Period:
2009 - late 2016
Type of work:
El Torito Hydroelectric Power Plant, Costa Rica

The project consists of the construction of the canal gratings, purchased from the company by Gas Natural. This includes two gratings that are 11.3 m high and 6.9 m wide, each divided into four modules. They have been manufactured in galvanized carbon steel and are designed to allow maximum flow of 160 m³/s per grating and seismic movement of 0.36 g.

The gratings can be removed using a system of guides and sliding wheels with a clamp beam, all of which is supplied by the company. The plant is located on the right bank of the Reventazón River and has nominal capacity of 50 MW. 

 