AL-HAY DWTP


AL-HAY DWTP

Coutex, Equipos y Proyectos, S.A. is the awardee of the equipment supply to AL-HAY DWTP (Iraq).

Client:
Ministry of Municipalities and Public Works of Iraq
Location:
Asia
Type of service:
Projects

Design, manufacture and transport of 165 wall mounted sluices, 6 canal sluices, 60 coffer dams, 6 adjustable weirs, 2 circular sand sorters and 4 telescopic valves.

Contractor company: China Geo-Engineering Corporation International Ltd. (CGCINT).

Al-Hay is a town with 100,000 inhabitants within the province of Wasit, 200 km from the south of Bagdad. The project includes construction the new Al-Hay, with a treatment capacity of 30,000 m3/day, a new first stage pumping plant and 300 km of channel.

The overall project was awarded to the construction company China Geo-Engineering Corporation International Ltd. (CGCINT) by the Ministry of Municipalities and Public Works of Iraq.

Our company has passed the approval phase as a supplier to the works Ministry of Municipalities and Public Works of Iraq.

 
DETAILS

Technical data

Wall mounted and canal sluices  

165 wall mounted sluices with loads up to 4 m water head; 6 canal sluices with a height of 1.4 m. Manufactured of AISI 304L stainless steel.

Adjustable spillways 

12 adjustable spillways, 8.7 m wide, manufactured of AISI 304L stainless steel.

Telescopic valves 

Telescopic valves of 450 mm diameter, manufactured using AISI 304L stainless steel.


Gallery