Plantations and measures to correct environmental impact
Plantations and measures to correct environmental impact
Conservation of plantations and corrective measures for environmental impact. Works executed and received prior to 31st May 2010 in Gerona.
Maintenance of the tree and bush plantations, watering from tanker truck and strimming the meadow areas.
Mowing and strimming.
Manual weeding.
Weed barrier.
Replacement of missing items.
Maintenance irrigation.
Maintenance of tree pits, guy cables, rods and protective elements.
Pruning.
Phytosanitary treatments, herbicides and fertilizers.
Tree transplants.
Maintenance of crossings for fauna.
Verification of the correct state of the structures designed.
Elimination of water pooling inside or at the mouths, whenever they hinder passage by animals.
Functionality of the microhabitats generated by the plant restoration with regard to the autochthonous with plant restoration in relation to the autochthonous fauna, especially on viaducts.
Maintenance of the fences by animal crossings and escape devices.
Installation of guiding perimeter fence and strip to lead amphibians and reptiles.
Contracting monitoring of the functionality of animal road crossings.
Technical data
Mown area: 563,144 m2.
Strimming area: 62,572 m2.
Manual weeding area: 12,514 m2.
Tree pits maintained: 146,759 units.