Construction of a tunnel under the Montjuïc mountain
Client:
Barcelona Municipal services, S.A.
Location:
Barcelona
Period:
From December 2002 to January 2004
Type of work:
Roads and tunnels
Budget:
2.418.908,34 € (VAT not included)
Construction of a 135m long tunnel under the Montjuïc mountain with a width of 12.40m and a height of 7,33m.
False tunnel stretches with 80cm thick screen walls, 2.144m2.
Realisation of different facilities: electricity supply, adjustable illumination, ventilation, telephony, fire fighting, traffic and signal control, and closed circuit television for surveillance.