Building a photovoltaic power station at Sant Pere Sallavinera, Barcelona


Building a photovoltaic power station at Sant Pere Sallavinera, Barcelona

End-to-end project for designing, building and commissioning a photovoltaic power station including services associated with the entire value chain of the facility throughout its service life.

Client:
Solar Lloch S.L.
Location:
Barcelona
Period:
February 2023 – August 2023
Type of service:
Photovoltaic power stations
Budget:
€2,455,490
With a population of less than 200 inhabitants, Sant Pere Sallavinera has one of the largest forest masses in l’Anoia.

This project has included all the stages for designing and building a 3.5 MWp photovoltaic solar power plant. Besides the technical and administrative approach, all the necessary authorisations, permits and licences were processed and obtained for project implementation (Ready-to-Build) along with its subsequent construction and operation.

Once on stream, the plant will generate 4,478MWh/year of sustainable energy through panels connected to

the grid. This action will help to generate clean energy in the region in line with environmental goals and leading to annual emissions savings coming to 2,803.52 t of CO2. 

The project included obtaining permits, purchasing materials and equipment, civil engineering work and setting up all the plant’s components including the route of the 25 kV line to the electricity output feeder. Following processing and licensing of the structure, the connection permit for commissioning was obtained and operation and maintenance services were delivered. 

 
DETAILS

Technical data

System data 

Nominal power: 
3,000 kWn 

Peak power: 
3.52 kWp 

Modules installed: 
7,668 460Wp panels  

Area  

Area of the solar plant site: 
53,366.08 m2 

Area of use: 
48,126.86 m2 

Capture area: 
15,352.41 m2 

Output  

Estimated annual output: 
4,478,464.57 kWh/year 

C02 savings 

Annual emissions savings: 
2,803.52 t CO2 