Construction of underwater outfall for the Torrevieja desalination plant


Construction of underwater outfall for the Torrevieja desalination plant

Client:
UTE IDAM TORREVIEJA
Location:
Alicante
Period:
July 2012
Type of service:
Maritime work
Speciality:
Underwater outfalls and intakes

Underwater work on an undersea trench, installation of 1,250 m de of GRP DN2000 piping, manufacture and installation of ballast blocks and diffusers and installation of concreted geotextile protection mats in the Torrevieja Harbour mouth section.

The work consisted in the installation of the underwater outfall of the Torrevieja desalination plant, 1,250 m in length, with 2,000 mm diameter GRP piping. The outfall was installed in a 3 metre-deep underwater trench, created by dredging with a hopper dredger.

To protect the outfall, we installed a geotextile mat, injected with concrete, in the Torrevieja harbour mouth section, and 78 concrete ballast blocks in the shape of an inverted “U”. The diffuser area features 64 reinforced concrete parts.

 
DETAILS

Technical data

Piping

Length: 1,250 m of DN2000 GRP.

Civil engineering works

Manufacture of 78 ballast blocks and 64 diffuser ballast blocks of reinforced concrete.

Covering and protection mat

Installation of 250 m of concreted geotextile matting.

Creation of trench

38,000 m³ dredging.

Vessel

OMVAC VII 5ª-VI S-3-05. 59.5 m length, 9.5 m beam. Tank capacity: 652 m³.

Diver team

1 team manager & 7 divers.

Diving system

Diving system with surface air supply, communication and lighting.