Supply and installation of power cord replacement


Supply and installation of power cord replacement

Supply and installation of power cord replacement for medium voltage electric cable and fibre optic in Prat de Llobregat ATLL concessionaire of the Generalitat de Catalunya.

Client:
ACCIONA Infraestructuras, S.A. ACSA Obras e Infraestructuras, S.A.U.
Location:
Barcelona
Period:
2 weeks (March 2015)
Type of service:
Integral installations
Budget:
53.119€ (VAT not included)

Supplying and laying of medium voltage electric wire and optical fibre.

Engineer: Francisco Javier Escartín García. Engineer of roads, canals and ports, collegiate member number 11275.

Replacement of medium voltage electric wire and fibre optics to supply the desalination plant located in Conca del Llobregat,

including fixation elements, protection, signalling, unipolar junctions and welding of fibre optic torpedoes.

 
DETAILS

Technical data

Medium voltage installation

Supply and installation of 2 circuits of 850 meters medium voltage electrical cable (RH5Z1 12 / 20kV 3 (1x240 mm2) AI, 12 unipolar thermo-retracting junctions at the ends and continuity test, screen ohmic resistance of screens, withstand voltage tests and partial discharge.

Fibre optic installation

Supply and installation of 2 fibre optic cables of 870 metres for outdoor, with 12 single-mode fibres (OS1) 9/125, reinforced fibre glass WB (water blockers), armour, interior and exterior LSHZ thermal plastic cover, installed inside a high pressure polyethylene tube.

 

It included the welding of fibres and reflexometry measurements.