Power supply and integrated services


Power supply and integrated services

Award of tender for the supply of power and integrated management and maintenance services for the municipal street lighting and traffic light system of Tortosa, to the joint venture made up of Acsa, Obras e infraestructuras and Sociedad Española de Construcciones Eléctricas (SECE).

Client:
Tortosa Municipal Council
Location:
Tarragona
Period:
From November 2014 to December 2014
Type of service:

The street lighting has been brought into line with regulations, with 61% lower consumption, and the traffic light system renewed with 80% lower consumption.

Only 1,058 t of greenhouse gases will be emitted per year, helping to prevent global warming. The contract includes works on refurbishing and improving the installations.

 
DETAILS

Technical data

Energy Services

Supply and management of the power involved in the operations required for the proper running of the installations.

Maintenance

Repair, with replacement and substitution where necessary, of worn-out items, to ensure optimal operation and performance of street lighting installations.

Replacements

Supply and installation of necessary parts for scheduled replacement of street lighting components.

Improvement and renovation work on installations consuming power

Comprising 7,250 lighting points.

Investments in energy savings and renewable energies

Including energy audits and savings actions in the buildings and fixtures of Tortosa Municipal Council. Also including equipment and installations that encourage energy savings and efficiency and the use of renewable energies.

Complementary work


Gallery